The programme featured a couple who decided to replace their draughty, 1940s pre-fabricated house in Tunbridge Wells, with its modern equivalent – an offsite-manufactured modular home.
The original home was constructed with a timber frame and asbestos cladding. Its three-bedroom modular replacement took the form of six cuboid modules manufactured in a Sussex factory by Boutique Modern.
The heavily insulated building sits on 14 concrete pad foundations, with the aim of building in two days. Each module spent 12 days on the production line.